Projects

Six recent jobs across the East Pilbara, from haul roads and camps through to concrete, tailings access and rehabilitation.

  • A grader working a wide red haul road cut through rocky country, a water cart further along

    Ophthalmia Haul Road Upgrade

    Talwarra Minerals

    Ophthalmia Range, east of Newman

    Eighteen kilometres of haul road widened to 30 metres, with table drains, two floodways and a rebuilt creek crossing.

    214,000 cubic metres shifted

  • Rows of accommodation units at a work camp at dusk, walkway lights on

    Jigalong Road Camp Expansion

    Boolgarrie Resources

    Jigalong Road

    A 96 room accommodation village with kitchen and dining block, wastewater treatment and power reticulation.

    96 rooms handed over in 31 weeks

  • A finished concrete pad at dusk with a round conveyor footing and starter bars set out

    Whitegum Crusher Pad and Conveyor Footings

    Whitegum Iron

    40 kilometres north of Newman

    Bulk earthworks, structural concrete and conveyor pedestals for a new crushing circuit, built alongside a running plant.

    1,900 cubic metres of concrete placed

  • An open workshop shed with plant inside and a water truck parked on the hardstand

    Barrimah Workshop and Wash Bay

    Barrimah Minerals

    Great Northern Highway, south of Newman

    A four bay heavy vehicle workshop with overhead crane, plus a wash bay, oily water separator and hardstand.

    2,430 square metres of hardstand

  • An access track winding between reshaped red embankments, seen from above

    Mundowa Tailings Access Works

    Mundowa Resources

    60 kilometres west of Newman

    Access tracks, laydown pads, culverts and erosion control around a tailings storage facility, programmed around the wet.

    11.4 kilometres of track formed

  • Rows of spinifex tussocks growing on reshaped red ground

    Talwarra Pit Rehabilitation, Stage 2

    Talwarra Minerals

    Ophthalmia Range

    Waste dump reshaping and battering, topsoil respread, deep ripping and seeding with locally collected provenance seed.

    34 hectares reshaped and seeded

Tell us about the job

Send us the scope and a rough program. We will tell you straight away whether we can crew it.

Get in touch