Built for the Pilbara.

Civil construction, earthworks and plant for mine sites across Western Australia.

Get in touch

We are a civil and mining contractor based in Newman. We build and maintain the roads, pads, camps and workshops that keep Pilbara sites running, and most of our crews live in town rather than fly in.

What we do

Leadership and vision

Three people looking over a drawing spread across the tray of a white ute, dust in the air

Our leadership

  • Grant MaddernManaging Director
  • Leanne HoddyGeneral Manager, Operations
  • Dean TrethowanConstruction Manager

How we operate

One superintendent owns each job from the pre start to the handover pack. Clients get a phone number, not a queue. If a job is running behind we say so at the weekly meeting, not at the end.

Vision and values

Do the work properly, leave the site tidy, and pay people what the job is worth. We want to be the contractor Newman keeps calling back, twenty years from now.

“We are judged on whether the crew turns up, the work holds up, and the site is left safe. Everything else follows that.”

Grant Maddern Managing Director

Operating responsibly

3.7

Total recordable injury frequency rate for the twelve months to June 2026, across 41 people on the books. Two recordable injuries, both reported the same shift.

Safety

Pre start every shift, take five before anything unfamiliar, and a stop work call that any crew member can make without ringing a supervisor first.

Environment

Dust suppression on every active road, wash downs before plant moves between tenements, and topsoil stripped and stockpiled so it can go back.

Community

We hire in Newman first, we take on apprentices every intake, and we buy fuel, tyres and consumables from local suppliers where the price is close.

Recent work

Six projects across the East Pilbara, from haul roads to camp builds.

  • A grader working a wide red haul road cut through rocky country, a water cart further along

    Ophthalmia Haul Road Upgrade

    Talwarra Minerals

    Eighteen kilometres of haul road widened, with drainage, two floodways and a creek crossing.

  • Rows of accommodation units at a work camp at dusk, walkway lights on

    Jigalong Road Camp Expansion

    Boolgarrie Resources

    A 96 room village with kitchen block, wastewater treatment and power reticulation.

  • A finished concrete pad at dusk with a round conveyor footing and starter bars set out

    Whitegum Crusher Pad

    Whitegum Iron

    Bulk earthworks, structural concrete and conveyor pedestals for a new crushing circuit.

See our projects

Four crew members in high vis walking together past parked machinery

Working at Newman

Getting good people to the Pilbara is harder than getting the work. We run even time on most crews, we keep camp rooms for the people who want them, and we would rather train a local fitter than fly one in for six months.

If you already live in Newman, tell us. Residential roles come up first for people who are here.

See our open roles

Latest news

  • Two water carts parked side by side on red gravel, tanks still clean

    Two new water carts join the fleet

    Both are on site from next week, which takes the dust suppression fleet to seven and lets us cover two haul roads at once.

  • Rows of accommodation units at a work camp at dusk, walkway lights on

    Jigalong Road camp handed over

  • An apprentice in high vis talking with two colleagues in a plant control room

    Four apprentices start with us this month